The weekly rebuild
Exports, formulas and copied tabs are rebuilt every week, and every rebuild is another chance for an error.

Manufacturing · Industrial reporting
A figure is questioned. Someone hunts through exports and formulas. Reviews slow down and teams cannot tell whether they are seeing an operating change or a data problem.
What we hear on manufacturing floors
When teams cannot tell an operating change from a data problem, reviews slow down and decisions wait.
Exports, formulas and copied tabs are rebuilt every week, and every rebuild is another chance for an error.
A dip in output could be a real problem or a missing record. Nobody can tell quickly.
Different shifts record the same stoppage in different ways, so the Pareto chart tells half the story.

How ABI helps
ABI works across source collection, reporting, quality checks and maintenance. Confirm platform and connector fit before promising them.
Data from machines, systems and sheets is gathered once, so engineers spend time analysing instead of assembling.
Gaps and strange values are flagged for review before they change a decision.
Output, scrap and downtime are defined once, and every report uses the same definition.
Reliable history shows which assets stop most often, so maintenance can be planned instead of reacted to.
What your team gets
With the report built once from agreed sources, which means supervisors stop copying and pasting every week.
With data quality rules watching the feeds, which means a missing reading is flagged the same day, not at month end.
With each figure traced to its source, which means the meeting is about the plant, not about whose spreadsheet is right.
IllustrationOn the floor
With production captured on a tablet at the line, which means numbers are recorded once, at the source, instead of rebuilt from paper at the end of the shift.
Each entry carries a name and a time, and anything outside the agreed rules is flagged for review.
Illustration: a concept photo with a sample screen. Not a client site or a screenshot.
Reports teams ask for
These are typical starting points. Your site may need a different mix, and the first conversation decides which one goes first.
Where the data comes from
ABI does not ask you to replace what works. The first step is a plain map of where each figure starts.
Which systems and connectors apply is confirmed with your engineering and IT teams.
Where to start
Every site is different. These Presoris modules are a common first choice. ABI confirms the right mix after looking at your production.
More output, less waste and less downtime.
See Production ManagementConsistent standards and less process variation.
See Product ManagementAccurate stock and fewer shortages.
See Inventory ManagementA clear view of how you are performing.
See Reporting
Who it helps
Reviews one trusted set of figures instead of debating which sheet is right.
Hands over a shift with exceptions already flagged.
Plans work from real downtime history, not memory.
Uses approved output and scrap figures for cost and planning.
A practical way to start
ABI has industrial production reporting and data-quality experience. Confirm site fit, responsibilities and scope together.
And we can explore a next step with you.
Identify its user and decision.
Trace how measures are captured and reviewed.
Confirm fit and responsibilities.
Map agreed sources for a clearer path to each figure.
Surface exceptions before relying on the report.
Credentials
Large buyers need suppliers they can onboard without friction. ABI keeps the paperwork current so your team does not have to chase it.
With 100% procurement recognition. Certificate valid to 18 March 2027.
ABI Solutions (Pty) Ltd, registration 2016/260973/07, in business and in good standing.
Experience with the Adroit process management platform, alongside the wider plant systems.
The B-BBEE certificate and company details are available to your procurement team.
Before a conversation
Possibly. BI tools show data well, but they cannot tell you whether the data is right. ABI works on the checking and approval before the data is shown.
Yes, OEE and downtime reporting is part of what ABI offers. How each measure is defined is agreed with your team first.
Part of the work is agreeing one list of reasons and checking entries against it, so the same stoppage is recorded the same way.
We do not assume it. Your systems, connectors, access and setup are checked with your engineering and IT teams first.

Start with one report
If you are ready to stop chasing figures and start explaining them, start with a short conversation. Tell ABI what you report, where the information comes from and what happens when figures do not line up.