Water and Wastewater · Industrial reporting

Make operational readings easier to review and explain.

Missing readings trigger calls across operators, engineers and administrators. The team needs to know what was checked, what remains an exception and who owns the next step.

The outcomeLess time chasing figures. More clarity about what needs review.
Missing readings start phone calls. Clear exceptions start work.Know what was checked.

What we hear in water and wastewater

Operators, engineers and administrators chase the same missing reading.

The team needs to know what was checked, what is still an exception and who owns the next step.

Gaps

Missing readings

A meter or telemetry link drops out and nobody notices until a report looks wrong.

Remote sites

Remote sites with patchy data

Data from many small sites arrives late or incomplete, and gaps are filled by guesswork.

Reporting

Reports built by hand

Monthly figures are assembled from several sources, with little record of what was checked.

Does this sound familiar?

  • A reading is missing and three people start phoning each other
  • Nobody is sure which values were checked and which were not
  • Compliance reports take days to assemble
  • The same gap shows up again next week

How ABI helps

Move from scattered records to a report the team can explain.

ABI offers data integration, user-defined quality rules and exception reporting. Water telemetry, lab integrations, regulation and standards must be verified.

A process controller with a tablet and a plant operator holding up a water sample beside the pipework

See records needing attention

Missing and out of range readings are listed in one place, instead of found by accident.

Clarify measures

Flow, level, dosing and sample results are defined once, so reports use the same meaning every time.

Route exceptions

Each exception goes to a named person with a status, so nothing sits in an inbox.

Separate compliance ownership

ABI supports the reporting. Your accountable specialists keep the compliance decisions.

What your team gets

Less rework. More time on the operation.

Stop chasing the missing reading

With gaps flagged as they happen, which means operators and engineers are not phoning around to find out what is missing.

Show what was checked

With a record of each check and review, which means the team can show what was reviewed and what is still open.

Report with less rework

With readings brought into one reporting path, which means regular and compliance reports take less time to put together.

Reports teams ask for

The reports that usually come first.

These are typical starting points. Your site may need a different mix, and the first conversation decides which one goes first.

Daily flow and level summary

Chemical dosing and consumption

Sample results against agreed limits

Plant throughput and performance

Alarm and exception log

Monthly management report

Where the data comes from

Start from the systems you already have.

ABI does not ask you to replace what works. The first step is a plain map of where each figure starts.

Telemetry and SCADA

Flow meters and level sensors

Laboratory results

Operator logs and spreadsheets

Maintenance records

Finance and asset systems

Which systems and connectors apply is confirmed with your engineering and IT teams.

Where to start

Modules most sites in this industry start with.

Every site is different. These Presoris modules are a common first choice. ABI confirms the right mix after looking at your production.

Data Warehouse

One trusted history of all your data, for better decisions.

See Data Warehouse

See all nine modules

A water treatment process engineer holding a tablet beside a pipe riser and valve

Who it helps

Different people, one set of figures.

Plant superintendent

Starts the day with a list of exceptions instead of a pile of calls.

Process controller

Sees which readings are missing and why, in one place.

Environmental and compliance officer

Reports from checked, approved data with a clear record behind it.

Engineer

Gets source faults routed with the evidence attached.

A practical way to start

Start with one report that creates the most friction.

ABI has industrial production reporting and data-quality experience. Confirm site fit, responsibilities and scope together.

And we can explore a next step with you.

Step 01

Choose one report

Identify its user and decision.

Step 02

Map sources and checks

Trace how measures are captured and reviewed.

Step 03

Agree a bounded scope

Confirm fit and responsibilities.

Know where it begins

Map agreed sources for a clearer path to each figure.

See what needs review

Surface exceptions before relying on the report.

Credentials

Certified, registered and ready for your procurement team.

Large buyers need suppliers they can onboard without friction. ABI keeps the paperwork current so your team does not have to chase it.

B-BBEELevel 4Contributor

With 100% procurement recognition. Certificate valid to 18 March 2027.

Established2016A South African company

ABI Solutions (Pty) Ltd, registration 2016/260973/07, in business and in good standing.

PartnerAdroitCertified system integrator

Experience with the Adroit process management platform, alongside the wider plant systems.

On requestSupplier packDocuments when you need them

The B-BBEE certificate and company details are available to your procurement team.

Before a conversation

Questions worth answering early.

Can ABI guarantee SANS 241 compliance?

No. ABI supports the data and reporting. Standards and compliance decisions stay with the accountable specialists.

Can ABI work with remote telemetry sites?

Telemetry and remote site monitoring is part of ABI experience. Which links and protocols a site uses is confirmed in the first conversation.

Who is responsible for the compliance report?

Your own accountable people. ABI helps make sure the numbers behind the report have been checked and approved.

Can ABI connect to our systems?

We do not assume it. Your systems, connectors, access and setup are checked with your engineering and IT teams first.

Start with one report

Which production number causes the most rework?

If you are ready to stop chasing figures and start explaining them, start with a short conversation. Tell ABI what you report, where the information comes from and what happens when figures do not line up.

Talk through the workflow