Metal Manufacturing · Industrial reporting

Know which production figures are ready to stand behind.

Output, scrap, downtime and shift records may sit across equipment, databases and spreadsheets. When numbers disagree, teams debate the record instead of the next action.

The outcomeLess time chasing figures. More clarity about what needs review.
When two numbers disagree, teams debate the record instead of the next action.Know which figures are ready.

What we hear in metal manufacturing

Output, scrap and downtime sit on different machines.

Records live on equipment, in databases and in spreadsheets. Pulling them together takes time, and the result is often questioned.

Records

Records spread across equipment

Weights, times and results sit on separate machines and are joined by hand.

Scrap

Output and scrap that do not reconcile

The tonnage made, the tonnage shipped and the scrap logged do not always add up.

Downtime

Breakdowns without a clean history

Without reliable stoppage records, it is hard to see which assets cost the most.

Does this sound familiar?

  • Output, scrap and downtime sit on different machines and never quite agree
  • Shift records arrive late or half complete
  • A corrected number has no trail behind it
  • The debate is about the record, not about the plant

How ABI helps

Move from scattered records to a report the team can explain.

ABI scopes collection, reporting, quality rules and maintenance. Confirm connectors, measures and correction workflows with technical owners.

A workshop foreman and a welder checking a tablet beside a steel fabrication table

Trace figures to sources

See where a number came from, who changed it and why, so a question can be answered in minutes.

Review exceptions

Missing or unusual values are flagged and reviewed before reports go out.

Align recurring records

Shift, batch and lot records follow the same rules, so reports line up from one period to the next.

Clear maintenance ownership

Faults at the source go to engineering, with the evidence attached.

What your team gets

Less rework. More time on the operation.

Line up output, scrap and downtime

With machine, database and spreadsheet records matched in one place, which means the numbers agree before they reach the shift review.

Trust the figure before you use it

With exceptions raised for review and approval, which means only checked figures go into the report.

Keep a clear trail

With changes logged, which means you can show how a corrected number came about.

Reports teams ask for

The reports that usually come first.

These are typical starting points. Your site may need a different mix, and the first conversation decides which one goes first.

Output and yield by line

Scrap and rework

Downtime and breakdowns

Energy and consumption by shift

Batch or heat records

Quality results against limits

Where the data comes from

Start from the systems you already have.

ABI does not ask you to replace what works. The first step is a plain map of where each figure starts.

PLC and SCADA (machine control systems)

Weighbridge and scales

Lab and quality systems

ERP (finance and planning system)

Maintenance logs

Spreadsheets

Which systems and connectors apply is confirmed with your engineering and IT teams.

Where to start

Modules most sites in this industry start with.

Every site is different. These Presoris modules are a common first choice. ABI confirms the right mix after looking at your production.

See all nine modules

A metal works production manager holding a tablet beside a stand with two lengths of steel beam

Who it helps

Different people, one set of figures.

Plant manager

Sees output, scrap and downtime on one page the team agrees on.

Metallurgist and quality

Works from checked results, with exceptions flagged.

Maintenance and engineering

Gets source faults with evidence, so repairs start sooner.

Finance

Reconciles tonnage and cost without chasing the floor.

A practical way to start

Start with one report that creates the most friction.

ABI has industrial production reporting and data-quality experience. Confirm site fit, responsibilities and scope together.

And we can explore a next step with you.

Step 01

Choose one report

Identify its user and decision.

Step 02

Map sources and checks

Trace how measures are captured and reviewed.

Step 03

Agree a bounded scope

Confirm fit and responsibilities.

Know where it begins

Map agreed sources for a clearer path to each figure.

See what needs review

Surface exceptions before relying on the report.

Credentials

Certified, registered and ready for your procurement team.

Large buyers need suppliers they can onboard without friction. ABI keeps the paperwork current so your team does not have to chase it.

B-BBEELevel 4Contributor

With 100% procurement recognition. Certificate valid to 18 March 2027.

Established2016A South African company

ABI Solutions (Pty) Ltd, registration 2016/260973/07, in business and in good standing.

PartnerAdroitCertified system integrator

Experience with the Adroit process management platform, alongside the wider plant systems.

On requestSupplier packDocuments when you need them

The B-BBEE certificate and company details are available to your procurement team.

Before a conversation

Questions worth answering early.

Can ABI repair a faulty machine or PLC?

No. ABI can show where data is missing or wrong. Engineering still repairs the fault at the source.

Can ABI work with our existing SCADA and historian?

That is where most projects start. The first conversation maps what is collected, where it is stored and who owns each source.

How do we start without a big project?

Pick one report, such as daily output and scrap, and prove the approach there before widening it.

Can ABI connect to our systems?

We do not assume it. Your systems, connectors, access and setup are checked with your engineering and IT teams first.

Start with one report

Which production number causes the most rework?

If you are ready to stop chasing figures and start explaining them, start with a short conversation. Tell ABI what you report, where the information comes from and what happens when figures do not line up.

Talk through the workflow